Showing posts with label Traffic. Show all posts
Showing posts with label Traffic. Show all posts

Thursday, July 31, 2008

"Wal-Mart unveils details of new super center planned for Clarkston"

The PARDners claim that they have saved the city of Pullman hundreds of thousands of dollars through their efforts at fighting Wal-Mart by "forcing" the retailer to pay a portion of installing traffic lights and traffic calming devices on Bishop Blvd.

Like everything else they have said, this is also a lie.

Down in Clarkston, where Wal-Mart has faced zero opposition, Wal-Mart is spending $500,000 on traffic upgrades, including two stoplights, widening a street, building a bus stop, erecting a sound barrier, and landscaping to limit vehicle light, VOLUNTARILY.

In addition, Clarkston is going to get the first Supercenter in Washington, and one of the first in the country, that incorporates a very cool new store branding. I'll have pictures later.

I'm sure much of the traffic improvements and coolness factor that could have been Pullman's was burned up along with the hundreds of thousands of dollars in legal expenses Wal-Mart likely had to pay to fight PARD's numerous frivilous and baseless legal challenges

Not to mention the fact that Clarkston will have their store and start reaping the sales tax benefits many months before the one in Pullman is built.

From today's Lewiston Tribune:
Wal-Mart officials said a new design is being considered for the Wal-Mart Supercenter to be built in Clarkston, in the Port of Clarkston area.

The super store Wal-Mart plans to build across from Costco in Clarkston will be an 180,000-square-foot building with a tire center, drive-through pharmacy and garden center.

Those services will be in addition to the groceries, clothing, toys, cosmetics, and electronics typically sold in Wal-Mart Supercenters.

A spokeswoman for the world's largest retailer shared more of the details about the store in an interview this week.

Jennifer Spall, a Wal-Mart spokeswoman in Seattle, couldn't immediately provide a date for the groundbreaking.

Construction, which Wal-Mart hopes will be finished by July, normally takes between nine and 12 months. Wal-Mart spends about another three months hiring employees and outfitting the store.

The Wal-Mart in Clarkston will be the first in Washington, and among the first in the nation, to have an updated look associated with a new branding effort, Spall said.

The front facade will have three entrances of various scale and design to break up the "mass of the building," Spall wrote in an e-mail.

Canopies will extend from the building walls over the sidewalk, according to the e-mail. "The roof line is broken up in varying roof styles and heights."

A large landscape feature, such as a mature state tree, will be placed in the vicinity of the entrance, Spall said.

Wal-Mart has promised to make upgrades of more than $500,000 to handle the 9,000 to 10,500 vehicles that will be driving to the store each day at Fifth and Fair streets.

The largest items in the package are two traffic lights, which will likely cost $250,000 each. One of the signals will be at Fifth and Fair streets. The other will be at 15th and Bridge streets.

Other improvements Wal-Mart will make include widening Port Drive adjacent to the Wal-Mart property from two to three lanes, a bus stop on Fair Street, a sound barrier on the south and western edges of the property that are closest to residential neighborhoods and landscaping to limit vehicle light from entering residences.
Technorati Tags:

Saturday, July 26, 2008

Say What?

Perhaps 10,000 persons who won't shop there might cause a funding problem. Why is there no discussion about the independent study? Are we looking at another typical Pullman fait accompli?

Thank you PARD for looking out for the future well-being of Pullman and attempting to make the decision makers accountable. It is too bad that the recent independent study could not have been included in your lawsuit. It proved Day's claim regarding traffic and congestion on Bishop Boulevard.
- Roger Pettenger, Letter to the Editor, Moscow-Pullman Daily News, July 25, 2008

Huh?

If thousands of petition signers from Moscow, Australia, Chile, Finland and other places around the globe won't shop at the Pullman Wal-Mart, then there will be no traffic problem on Bishop Boulevard. This has been the basic flaw in PARD's reasoning from Day One. They simply can't have it both ways. It's either Boom Town USA with unbearable traffic or economic blight. Pick one of the above.

Let me put it another way, again. If those "10,000 people" had only donated $4.50 each, then PARD could have paid to have their own traffic study conducted. As it was, they didn't. The Hearing Examiner and the courts looked at the studies conducted by Wal-Mart, the city, and WSDOT, and those studies all came to the conclusion that traffic on Bishop, with Wal-Mart's mitigations, would be fine. Law 101: Present evidence to support your case or go home.

This latest traffic study factored in Wal-Mart's contributions to help control Bishop traffic.. I'm sure the city is grateful to have Wal-Mart help pay for traffic lights (no other Pullman retail business has ever been made paid to pay for traffic lights before), as well as the extra $1 million plus a year in sales tax revenue to help with roadway improvements.

Pettenger and all the rest can just stop their sour grapes. Nothing can be done now. The decision about Wal-Mart cannot be reversed based on evidence presented now The federal and state constitutions prevent such ex post facto and violation of due process effects.

Technorati Tags:

Tuesday, April 15, 2008

Dino Rossi Announces Transportation Plan



I lived in the Washington, DC area from 1985-1997. I experienced some of the worst commutes to work you can imagine.

I lived in the Seattle area from 1997-1999 and experienced equally bad, if not worse commutes (second worst congestion in the country in 1999.)

Here's the difference. When I went back to the DC area in 2005, I-95 and I-395 in Virginia had been dramatically expanded. New lanes, bridges, interchanges, overpasses, etc., had been added. I hardly recognized the roads I used to drive every day. Traffic is still horrible (fourth worst in the U.S. in 2005 according to the Texas Transportation Institute), but how bad would it be had they done nothing?

Meanwhile, virtually nothing has been done to improve SR 167 and I-405 in King County in the 12 years I have lived in Washington, despite rapid population growth.

As I said on the radio yesterday, like Ronald Reagan, I did not leave the Democratic Party, it left me. The Democrats used to be the party of the working man. The Democrats used to be the party of job- and business-creating public works projects, such as dams and bridges, that increased our quality of life and invested in the future. That is no longer the case, particularly in Washington. The Washington Democratic Party may as well be the Green Party. The interests of fish, trees, and snooty latte liberals have come before the interests of the working class.

What could be more important to working people than affordable housing? Yet the Growth Management Act, foisted on us by the Democrats, has made housing unaffordable statewide, particularly in the Puget Sound area. So if you can't afford to live close to work, then you have to commute. Again, the Democratic intransigence to do anything with the road system in the Puget Sound area has forced working people to spend more hours every day in their cars instead of with their families.

Why? Because the attitude is that if we build more roads, then more people will move to Washington. The Greens Democrats want to pull up the drawbridge and seal Washington off from the rest of the world to stop that evil "urban sprawl" (a myth, by the way) and force people into more environmentally-correct public transportation (even though cars stuck in traffic burn more gas and emit more pollution,) which is not practical for most working families. And that's okay with the elitist NIMBYists who want to keep their view of the Olympics uncluttered by tract housing.

The theory didn't pan out, however. Washington has continued to grow rapidly, despite the poor transportation infrastructure, and now the chickens have come home to roost. It's been nearly 20 years since the Nimitz Freeway collapse in Oakland and the Alaskan Way Viaduct still poses a serious risk of killing thousands. The 520 floating bridge likewise could sink in a strong windstorm, possibly killing hundreds. Needed replacement ferries are still on the drawing board. Boeing moved it's headquarters to Chicago. How many more businesses will move out of Washington because of long commmute times and a do-nothing government? We are in gridlock, literally and figuratively. And it affects us in Eastern Washington, because when the Puget Sound catches a cold, we get the flu. Tax dollars that should be going to our transportation needs end up on the west side instead. Remember the 9.5 cent gas tax hike that was supposed to fix all these problems? Yeah....

Rossi's ambitious plan, among other things, calls for the state to spend $15 billion (without raising gas taxes) on a tunnel to replace the Viaduct, widening I-405 from Renton to Bellevue (the road I used to drive every day), and replacing the 520 floating bridge with an eight-lane bridge. This is bold leadership. This is what government is supposed to be about. Come November, Washington voters are going to see the clear differences between Dino Rossi and Chris "Status Quo" Gregoire.

Saturday, March 22, 2008

Consultant: Wal-Mart Key to Bishop Blvd. Traffic Control

A traffic consultant who conducted a traffic study of Bishop Blvd. has recommended traffic lights be installed at the intersections with Harvest, Footloose and Fairmount by 2012. Wal-Mart, of course, has already agreed to help pay for traffic signals at Harvest and Fairmount.

From Wednesday's Moscow-Pullman Daily News:
The council heard from Bellevue, Wash., consultant Gary Norris, who presented the findings of a recently released Bishop Boulevard traffic study. The council requested the study in order to prepare for increased traffic loads in the Bishop Boulevard area due to new retail, such as the proposed Wal-Mart Supercenter.

The study was compiled through use of traffic counts, speed and delay studies and collision data to estimate future needs for stop lights, pedestrian crosswalks and other elements that would provide for safe multi-modal transportation. Estimating a 2.8 percent rate of growth, Norris said the city should install stop lights at the Bishop Boulevard intersections of Harvest and Footloose drives and Fairmount Road by 2012. U-turns also should be provided throughout the corridor and medians to calm minor street traffic.

The cost for the five-year plan is estimated at $2.1 million, with the understanding that Wal-Mart will pay for signalization of Fairmount Road and Harvest Drive if it locates on Bishop Boulevard.

Norris said the roadway should be expanded to two lanes in each direction by 2027. By that time, additional turn lanes and a signal on Johnson Avenue should be added at nearly every intersection onto Bishop Boulevard. The 20-year cost estimate is $9.1 million, which also would include landscaping.

Public Works Director Mark Workman said he will continue to review the study and evaluate funding options.

"The traffic is getting worse and it's something we're going to have to deal with," he said.
Technorati Tags: